Paddy Products
Nursery Preparation:
About 320 sq.mt. nursery areas are required for transplanting one-acre main field. The nursery should be well puddled, levelled and free from weeds and the area should have adequate water for irrigation and facilities for drainage. Plough the nursery area 2-3 times to bring the soil to a fine tilth. Puddle the soil properly so that 2-3 cm layer of water is maintained in the nursery bed. Apply 250 kg FYM, 2 kg Urea, 2.5 kg SSP & 1 kg MOP in nursery bed as nutrient management.
Sowing Time
Kharif : May & June
Rabi : November & December
Seed rate
8-10 kg/acre (for improved variety) and 6 kg/acre (for Hybrid)
Sowing method
Treat the seeds with carbendazim @ 1.5g/kg and soak in water for 12 hours. Then incubate it for 36-48 hours or till it sprouts properly. Broadcast sprouted seed uniformly in the seed bed and maintain 2-3 cm water level till sprouted seeds are established.
Main Field Preparation:
The aim of good tillage is to ensure suitable puddling of soil, which can restrict the loss of water due to percolation and consequent loss of applied fertilizers. Plough the land 3-4 times and each ploughing should be followed by clod breaking operation. Incorporate 6 t/acre organic manure (FYM) in the soil. Level the land properly before letting in water.
Nutrient Management (kg/acre):
Before Transplanting (Basal dose)
Urea – 10
DAP – 50
MOP – 20
Zinc sulphate – 12
Tillering stage
Urea – 30
DAP – --
MOP – --
Zinc sulphate – --
Panicle Initiation stage
Urea – 30
DAP – --
MOP – 20
Zinc sulphate – --
Transplantation:
Transplant 20-25 days old healthy seedlings (for kharif) and 25-30 days old healthy seedlings (for rabi) at 1 seedling (for hybrid) or 2 seedlings (for improved variety) per hill. Spacing should be followed at 20 cm between lines & 15 cm between plants.
Weed management:
Weeds can be reduced by proper puddling and water management in paddy. Butachlor @ 1 kg per acre is recommended. The chemical should be applied 2-5 days after transplanting. Water should remain in the field for 3-4 days after the application of herbicide.
Water Management:
Irrigate upto 2-3 cm level of water in the main field for initial 15 days, thereafter maintain 3-4 cm water level till crop reaches grain maturity. In absence of rains irrigate the crop at tillering, ear emergence, flowering and grain filling stage. Water needs to be drained prior to top dressing of nitrogen, panicle initiation stage and 2-3 weeks before harvest, depending on whether the soil is light or heavy.
Disease & Pest management:
Blast
Spray Carbendazim@400g/acr or Tebuconazole 50% + Trifloxystrobin 25% @80g/acre.
Sheath blight
Spray Propiconazole 75%@ 200ml/acre or Validamycin 3L @400ml/acre. Repeat the spray at 7-10 days interval.
False Smut
Spray Copper hydroxide 77% @ 400 g/acre or Tebuconazole 25% @ 400 g/acre at boot leaf stage. Second spraying should be done after 7- 10 days for effective control of false smut or Copperoxychloride@0.3% at panicle emergence stg.
BLB
Apply Streptomycin sulphate (9%) + Tetracyline hydrochloride (1%) @ 200 g/acre along with Copper oxychloride @ 400 g/acre.
Stem borer
Broadcast Cartap hydrochloride 4G @ 10kg/acre mixing with sand at 1:1 ratio or spray Chlorantraniliprole@60ml/acre.
BPH
Spray Imidacloprid@50ml/acre or Pymetrozine@120g/acre.
Use 200 L of water for one acre.
Harvesting & Threshing:
Harvest the crop when 80-85% of the grains are matured either manually by sickle or reaper or by using combine harvester. Threshing is carried out at 16% grain moisture content and storage done at 12% moisture content.
Above given contents are based on results of research centres and advisories of central & state agricultural research institutes. The result may defer based on geographical and climatical conditions.
_edited.jpg)